Results 1 to 2 of 2
  1. #1
    Snowatch Owner & Snow Forecastor
    Join Date
    Apr 2006
    Location
    Wollongong, NSW
    Posts
    15,700
    Blog Entries
    3

    Default Thredbo Development Plans - refurbishment of poolside terrace

    Looks like the pool is going to be paved over and a couple of hot tubs added around the perimeter. This allows more people to fit inside the area. Works to start in Feb and finish April 2019.

    DA 9784 Thredbo Alpine Hotel, Thredbo - refurbishment of poolside terrace

    http://majorprojects.planning.nsw.go...ob&job_id=9784



    Proposed works:


    • Cover the existing pool and pave over
    • Replace existing hot tub with two hot tubs
    • Fix existing paving
    • Upgrade existing lighting
    • i=Install timber fencing to hot tub are
    • Install fixed furniture





    Follow the Snow! snowatch.com.au

  2. #2
    Snowatch Owner & Snow Forecastor
    Join Date
    Apr 2006
    Location
    Wollongong, NSW
    Posts
    15,700
    Blog Entries
    3

    Default Re: Thredbo Development Plans - refurbishment of poolside terrace

    Anyone know if they have started this? It was only approved on the 18th of March. Was originally supposed to be finished in April 2019.
    Follow the Snow! snowatch.com.au

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •