Looks like the pool is going to be paved over and a couple of hot tubs added around the perimeter. This allows more people to fit inside the area. Works to start in Feb and finish April 2019.

DA 9784 Thredbo Alpine Hotel, Thredbo - refurbishment of poolside terrace

http://majorprojects.planning.nsw.go...ob&job_id=9784



Proposed works:


  • Cover the existing pool and pave over
  • Replace existing hot tub with two hot tubs
  • Fix existing paving
  • Upgrade existing lighting
  • i=Install timber fencing to hot tub are
  • Install fixed furniture